preloader
This website uses cookies. The essential and functional cookies are necessary for the proper functioning of the website and cannot be refused. Other cookies are used for statistical purposes (analytical cookies) and are only placed after you have made a choice. Read more about it in our Cookie Policy. cookie at the bottom right of our website.
Accept
Configuration
Decline
cookie
Cookies configureren / Configurez les cookies / Cookies configuration

(NL) Functionele cookies zijn essentieel voor de werking van de website en kunnen niet worden gedeactiveerd. Om uw ervaring te verbeteren, worden andere cookies gebruikt. U kunt ervoor kiezen om ze uit te schakelen. Ze kunnen op elk moment worden gewijzigd via dit venster.

(FR) Les cookies fonctionnels sont essentiels pour le fonctionnement du site internet et ne peuvent être désactivés. Pour améliorer votre expérience, d'autres cookies sont utilisés. Vous pouvez choisir de les désactiver. Ils restent modifiables à tout moment via cette fenêtre.

(EN) Functional cookies are essential for the operation of the website and cannot be deactivated. To improve your experience, other cookies are used. You can choose to turn them off. They can be modified at any time via this window.

Functionele cookies / Cookies fonctionnels / Functional cookies
Analytics- en marketingcookies / Cookies d'analyse et de marketing / Analysis and marketing cookies
Opnemen / Sauvegarder / Save

TVH Equipment Waregem

TVH Equipment's new building, distinguished by its round design of 90 meters in diameter, integrates complex technologies such as ventilation, electricity, HVAC, plumbing, and innovative building management systems, all developed in BIM and optimized for efficient operations.
TVH Equipment Waregem

Implementation of technical systems in the new building for TVH Equipment, known for rental and sale of forklifts and aerial work platforms.

If you've already passed the E17, you've undoubtedly noticed it: the building with a fully round shape, boasting a diameter of 90 meters, is truly an architectural landmark.

A multi-technical project:

- Ventilation
- Electricity
- HVAC & Plumbing
- Innovation & Building Management


The project was entirely developed in BIM. The building is a fine blend of industrial and office spaces. The ground floor hosts various workshops for maintenance and repairs of forklifts, equipped with around 40 ports facilitating smooth in-and-out movements. The basement will serve as parking, allowing more space outside for machine storage. The central courtyard will also be used for informal meetings.

By late February 2024, the startup of heating, cooling, ventilation, lighting, temperature and presence monitoring, and CO₂ measurement systems was in full swing. Automation and tuning of all systems are handled by EEG Digital Building Solutions in collaboration with Schneider. A first for our branches is the centralization of all controls on a single platform. This required extensive preparation but results in seamless integration of systems, leading to savings in both labor and materials.

Also, note the complexity that comes with a round building. Straight long pipes are suddenly not the norm anymore.